Notes · 19 October 2026 · 5 min read

Date in Use: why the first-use date of a reagent lot matters to an assessor

The Date in Use ties a reagent lot to the results it produced. Why ISO 15189:2022 asks for it, where the record goes wrong, and how to date it reliably.

The Date in Use is the day a reagent, calibrator or control lot first went into routine service. A Date in Use is only as good as its evidence.

  • ISO 15189:2022 lists it among the records a laboratory keeps for each reagent and consumable
  • It is the date that connects a lot to the patient results, QC and external quality assessment (EQA) results produced with it
  • It should be recorded on the day, by a named person
  • It should agree with the QC record

What the standard asks for

Clause 6.6 covers reagents and consumables from reception to disposal. Two parts meet at the Date in Use.

  • Acceptance before use (6.6.3). Each new formulation is verified for performance before it goes into use. So is each new lot or shipment. That verification must be complete by the Date in Use. A lot used before its acceptance is signed has broken the rule, whatever the later results show.
  • Records (6.6.7). For each reagent and consumable the laboratory keeps its identity and lot. It keeps the date received and the expiry. It also keeps the date it went into service. Where relevant, it keeps the date it was taken out of service.

The clause does not say how the date is captured or where it is kept. A column in a controlled Excel log meets it, provided the entry is complete and can be relied on.

Why an assessor looks at it

An assessor uses the Date in Use to test whether the other records hold together. Three checks follow from it.

  1. Was the lot accepted before it was used? The acceptance sign-off date should fall on or before the Date in Use. If it falls after, the lot went into service unaccepted.
  2. Was it in date? The Date in Use should fall before its expiry. So should every day the lot stayed in service.
  3. Does it match the analyser? Internal QC is run on a new lot on the day it starts. A Date in Use that does not line up with the first QC on that lot suggests the date was reconstructed, and reconstructed dates weaken every investigation that depends on them.

Why it matters after the assessment

The Date in Use earns its keep months later. An EQA result may fall outside its analytical performance specification (APS). A run of QC may step up. Either way, the first question is what changed and when.

  • A lot record with a reliable first-use date answers that directly: the shift either lines up with a lot change or it does not
  • Without the date, the laboratory is matching QC charts to delivery dates and estimating
  • The same is true of a recall. Knowing when a lot went into service and when it came out bounds the results that need review

Where the record goes wrong

Rarely through carelessness at the bench. The common failures are these.

  • Written days later from memory. The lot went on over a busy weekend and the log was filled in on Monday. The date is a best guess.
  • Never written. The lot is plainly in use and the box is open on the shelf. Yet the Date in Use column is blank.
  • Earlier than the evidence allows. A date before the lot was received is a record that contradicts itself. So is a date before its acceptance was signed.
  • Overwritten. A second person corrects the date without saying so, and the original entry is lost.

Each of these is fixable in the procedure without new software:

  • Record the date on the day
  • Require initials
  • Check the date against receipt and acceptance before it is written
  • Never replace an existing entry without a comment that says why

How LotWarden dates a lot

LotWarden does not decide when a lot goes into use. It makes the record of that decision harder to get wrong.

  • In Date in Use a person finds the lot by part of its name or lot number, or by scanning it
  • Lots waiting for a date appear with their expiry
  • Each lot on the list takes its own day: today, yesterday or any date
  • The preview names the file, sheet and row before anything is written
  • It warns when a lot of the same product expires sooner
  • It warns when QC acceptance is not recorded
  • It warns when the date is over a week back
  • A lot already dated is refused and listed. So is a date before the lot was received
  • A lot expired by then is refused and listed, as is a lot whose QC is not acceptable
  • The entry is written to the LotWarden log or a working copy of the department's own log, signed and dated
  • IN USE is set to Yes, and a backup is taken first

With EQAWarden linked, the day each lot first ran on an analyser is read from the internal QC record. It is offered as the Date in Use for a person to confirm.

  • LotWarden writes it only after a person ticks the line. The signed-in person is recorded
  • An existing date is never replaced: a proposed date that differs is shown beside it for a person to resolve
  • Lots in use without a Date in Use appear in the weekly Reviews
  • Lot history shows each lot's first Date in Use and where it came from

Plainly answered

Is the Date in Use the same as the date the lot was received?

No. The date received is when the lot arrived in the laboratory. The Date in Use is when it went into routine service, which comes after acceptance and can be weeks or months later. ISO 15189:2022 asks for both, because they answer different questions: the first about storage and condition, the second about which results the lot produced.

Does a lot need a Date in Use for each analyser?

The standard does not say. Many laboratories keep one Date in Use per lot in the department log, the day it first went into service anywhere. Where a lot runs on several analysers and starts on them on different days, the QC record holds each analyser's first day, and an investigation into one analyser should use that analyser's date.

What should we do if a Date in Use was never recorded?

Do not invent one. Take the date from evidence, most often the first internal QC run on that lot, record where the date came from and who entered it, and note that it was added after the event. A date with a stated source is defensible at an assessment; a guessed one is not.

Can the Date in Use be earlier than the acceptance sign-off?

Not if the procedure is followed. Clause 6.6.3 requires a new lot to be verified before use, so the sign-off should come first. A Date in Use earlier than the sign-off means the lot went into service before it was accepted, and that is a finding to investigate rather than a record to correct quietly.