Receiving, lot control and quality records
LotWarden supports the receiving workflow, from extraction of delivery details to verified entries in the laboratory's working logs.
- Functions include acceptance checks, expiry review and stock planning
- They also cover dates of first use, lot history and documented review
- Available controls depend on the department, laboratory setting and licensed configuration
- The department is chosen in the banner, and each section below works with that department's files
- Each person can make the department they work in their default, and LotWarden opens on it whenever they sign in
- An Administrator can set each person's default from the Accounts page
- Staff who move between departments choose another for the session
Receiving dashboard
Receive a delivery is the first page in the menu. Its four figures are calculated from the department's loaded files each time the page opens, and opening the page changes no record.
The four figures
Select a figure or View list to open the items it counts.
- Deliveries this month. One supplier's goods received on one day count as one delivery. The list shows each delivery's lines with the product and lot, the expiry and the destination log.
- Lots not yet accepted. In a department that keeps acceptance, lots received in the last six months that are not yet shown as accepted. By default that is Chemistry in the pathology setting, against the pre-acceptance testing (PAT) register. In the other settings it is every department. The figure opens that list. Elsewhere the figure is Expired on the shelf, and it opens Take off the shelf.
- Expiring in N days. Unopened lots that expire within the department's expiring-soon period (N is 30 days unless the department changes it). The figure opens Use these first in the stock outlook.
- To order. Products estimated to run short before a new delivery could arrive. The count also appears in the side menu.
Loading and reading
Load the department's files before the delivery note PDF, so that checks and log updates use the current copies.
- Each loaded step shows a green tick
- The delivery note goes in the blue drop box
- The program opens on the section last used
- It returns to Receive a delivery once a delivery note has been read
Supplier layouts
LotWarden reads scanned delivery notes by optical character recognition (OCR) on the licensed PC. No document is sent to an external service.
Teach a docket
Each supplier's letterhead and column layout is configured in the Docket library with Teach a docket. It uses one clean and unannotated scanned delivery note.
- Name the supplier. Select it from the workbook's supplier list, or enter a new name.
- Add a reference delivery note. It is read immediately, and every section found on it is displayed.
- Check the columns and confirm. Until it is confirmed the supplier remains pending, and unconfirmed layouts are discarded when the program restarts.
After the layout is saved
The saved layout is then used for that supplier's later delivery notes in every department.
- A saved layout can be removed
- A saved layout does not remove the need to check: each later delivery note is still read, displayed and verified before anything is written
- If a supplier is not recognised during receiving, an amber banner says so and offers to set it up from that same delivery note
- A delivery note with an unusual layout can be brought in as a prepared supplier file and corrected in the same way
- New suppliers are added to a department's logs from the program
- Every log carries a standard supplier list tab
Layout checking
Where each layout comes from
Each reading states the source of its layout. A layout worked out from the page is never shown as confirmed.
- Worked out from this page
- The confirmed layout
- Columns set by the laboratory
- The delivery note's own headings
Choosing the reading
Read confidence is a score of how well the chosen columns account for the page. It is a fit score, not a measure of field accuracy.
- On a delivery note with fewer than three lines the program states that it cannot assess the fit
- Candidate readings side by side. Where no layout has been confirmed, each candidate reading is shown with its score. They are named Reading 1, Reading 2 and so on. Each shows what it found and its first lines. Use this reading selects one. A banner reports Clear best reading or Two readings are close. Otherwise it reports No reading explains this docket well.
- Check one line against the paper. Enter a lot or code and one further value exactly as printed. Each reading is tried, and the best reading that reproduces that line is selected.
Check or adjust the layout
The layout can be opened after any reading, showing the scanned page with its column strips. The strips can be dragged, and the note is read again.
- Say what a word is. A word can be clicked and marked as a code or a lot. It can also be marked as an expiry or a quantity. It can be marked as a description or as not needed too.
- Kept for the supplier. Word rules are kept for that supplier when the layout is confirmed.
- Correct, then confirm. A section holding two fields can be split, or an outer column dropped. The page can be re-read or the layout worked out again. Confirmation records how the layout was chosen and its score. It also records the runner-up, and who confirmed it and when.
Layout features handled
Layout features handled include:
- Headings set over two lines
- Code columns under differing headings
- Separate-shipment lines (excluded)
- Footer notices (not read as items)
- Ordered, delivered and balance quantities (reconciled)
- Labelled sub-lines that give the lot and expiry
Checks recorded at receipt
Condition on receipt
The receiver records one condition for each delivery: goods intact and cold chain OK, or NOT acceptable. LotWarden records the receiver's selection. It does not inspect the goods or monitor temperature.
- The entry is written to the logs' Condition column
- It is recorded in the audit trail and flagged in red on the investigation report
- Non-stock lines. Freight and delivery-fee lines can be excluded with one selection. Excluded lines are not checked or logged.
Expiry on arrival
Each lot's expiry is checked as it is received.
- Expired on arrival. The expiry cell is shown in red with an EXPIRED badge. The lot is placed on the investigation worklist with a quarantine or return action.
- Short-dated. Lots expiring within the department's short-dated period (90 days unless changed) are flagged amber, to be used first or queried with the supplier. A supplier can be held to the minimum expiry agreed with it. The agreement is shown on the receiving flag.
The department's own periods
Each department sets when a delivery counts as short-dated and when a lot on the shelf counts as expiring soon (30 days unless changed).
- Each change needs a reason, is made by an Authoriser and is audited
- The stock outlook and reviews use the department's numbers. So does the assessment pack
- In the network version, each laboratory's network summary uses them too
Quantities
Quantities are pre-filled only where the reading is clear. Only quantities confirmed by the operator are written to the logs.
- Low-confidence quantities are flagged for verification
- Values that cannot be read are left blank for the receiver to count
- A quantity marked in pen is flagged, with a best-effort reading shown to check
- Its Qty Received is left blank for a person to count
- Values are corrected in the table of lines
- How the note is read can be corrected on the scanned page itself, under Check or adjust the layout
- Word rules are kept for each supplier
The rate at which lines need correction is reported under Reader accuracy.
Lot acceptance
How a lot's acceptance is checked depends on the department and the laboratory setting.
By setting
Both records are described under Lot release.
- In the pathology setting, Chemistry lots are checked by default against the laboratory's pre-acceptance testing (PAT) register
- In that setting, other departments confirm bench verification
- In the forensic setting, every department uses LotWarden's own acceptance record
- In the haematopoietic stem cell (HSC) collection and cell therapy settings, every product goes through the materials record (a release check)
The register check
For the register check, load a current copy of the Stock Report (the PAT register workbook) before each delivery. The register changes as testing proceeds.
- The Lot acceptance cross-check gives each received lot one register status: ACCEPTED, AWAITING SIGN-OFF, PAT IN PROGRESS, REJECTED, NOT ON REGISTER, UNCLEAR, NO LOT, or NO REGISTER when no register is loaded
- Lots that need action are listed. Accepted lots are summarised as a count.
- Shared lot codes. Where one lot code covers several assays, lots are matched by product name and flagged.
- The complete cross-check is saved as a LotCheck workbook for each delivery.
Products and PAT
Every product in the department's logs appears on a product list with its PAT status. A product not on the register needs PAT unless someone ticks it Exempt from PAT, with a reason.
- Each tick and untick is audited
- On a site already in use, products that were exempt under the earlier rule start ticked and are marked as carried over
- Nothing changes until someone unticks them
First receipt
Each lot is also looked up in its own log, the department's past years' logs and the LotWarden log. The LotWarden log keeps every receipt across the years.
- A lot received for the first time is marked NEW LOT on screen and added to the investigation worklist
- A lot received in December and again in February is recognised as the current lot
- Investigation worklist. PreAcceptance_Investigation lists the new and untested lots, and those awaiting sign-off or rejected. Each has the action required and blank Investigated By and Outcome columns. It is saved as a workbook and prints from LotWarden on one A4 page. Recent lists can be printed again from Lot history.
- In departments without a register step, each new lot is flagged in the preview. The operator confirms that it will be verified at the bench before anything is written
Lot release
Where the licence includes the acceptance record, LotWarden keeps its own record of each lot's checks and release.
What it covers
It applies to products a department flags as critical. In the HSC collection and cell therapy settings, every product is critical unless marked otherwise.
- The record is sealed (encrypted) on the drive
- Each change is written to the hash-chained audit trail
- In the pathology setting, a department can also be set to record all its acceptance here instead of in a register workbook
- A department on the PAT register continues to use its register as before
Check and release
A lot is quarantined when it is received. It is then checked, and released or rejected with the reason.
- Before-use check. The check is recorded in the laboratory's own words: what the check is and what it found. The method is set by the laboratory, not by LotWarden.
- Second-person release. It is required in the forensic, HSC collection and cell therapy settings. It is also required wherever a product flagged critical asks for it. The person who recorded the check cannot release the lot. Release is signed by an Authoriser with an electronic signature. When the lot is put into use, one Comments line is added to the log. It reads: Released dd/mm/yyyy by AB, second person CD.
- Certificates. A certificate can be kept for each lot as a PDF, PNG or JPG file. It is sealed, with a fingerprint of the file in the record.
Rejection and embargo
A rejected or embargoed lot is refused a Date in Use under every setting.
- A released lot can be embargoed after a later failure, and the embargo can be lifted
- Each is recorded with its reason. Earlier entries are kept, not edited or deleted
- Every rejected lot. All rejected lots recorded in the PAT register and in LotWarden's own acceptance record can be listed for one department or all. The list can be searched, printed and saved to Excel. It gives the date and reason and who recorded it, where the record holds them.
A lot not yet released
What happens to a lot not yet released depends on the setting. It:
- Can be given a Date in Use in the pathology setting, with a warning and a reason
- Is refused there when the product is flagged critical and set to refuse
- Is refused in the forensic, HSC collection and cell therapy settings
Where it appears
The record shows in the figures on Receive a delivery and in the weekly queue.
- It also shows in Lot history and the reminders
- It is on the assessment pack's Acceptance record sheet
Settings
An Authoriser sets these on the Records tab, and each is recorded in the audit trail:
- The laboratory setting in force, chosen with a reason from those the licence names
- Which departments use the register, the acceptance record or neither
Log updates
Confirmed entries are written to the LotWarden log, to working copies of the laboratory's own logs, or to both. The original workbooks are not changed. Transferring the entries into the controlled log is a separate step carried out by staff and confirmed under Log transfers.
The LotWarden log
LotWarden also keeps its own log of every receipt, Date in Use and removal. It is one record across the years.
- Each department chooses its own logs, the LotWarden log or both
- It has a yearly workbook for printing
- LotWarden writes it and draws its monthly PDF itself, with no Microsoft Excel
- It is on by default when LotWarden is first set up
- A department with no receipt log of its own can use the LotWarden log as its log, with nothing to set up
- A department with its own logs has both written in the same step
- Each scanned delivery note is kept and filed by department and day
- A kept note is never written over, and it opens from the lot's history
Preview and backup
Add to Logs shows each line's destination workbook and sheet. Nothing is written until the operator confirms.
- Received by is the signed-in person
- ISO 15189:2022 clause 6.6.7 covers these records for reagents and consumables
- The laboratory's own logs are written through Excel with macro execution disabled, leaving validation rules and macros in place
- On a licensed PC without Excel, those entries wait, with a message, until Write the waiting entries is used on a licensed PC with Excel
- A timestamped backup of each workbook is taken before every write
- Each entry carries a DN stamp naming the delivery note it came from
Routing and columns
In Chemistry, each line is routed by material number against the site's own classification.
- A line not placed that way is then routed by product name against the Cal/QC mapping and the workbook's supplier lists
- In other departments, it goes to the log and sheet in the department's folder that name the product
- Columns are located from each sheet's own headings
- Kit Insert and QC columns are recognised and never written
- A log that follows no template is also read by its headings, so a department can keep its existing workbook
Products not recognised
A “? check” badge means the product is not recognised.
- In Chemistry the person assigns it once to the Cal/QC or Reagent log, and later deliveries follow
- In other departments the person picks the product from the department's own log, and its supplier code is remembered
Duplicate records
A line with the same product and lot from the same delivery is skipped. The same delivery is identified by received date or delivery note number. The same lot arriving on another day is treated as a new receipt.
- Existing entries. A lot already in that month's log is shown beside the new line, including a hand-typed entry with no DN stamp. It shows the entry's date and quantity. It also shows the lot and the person who entered it.
- Operator choice. For each item the operator chooses one of three: keep existing, overwrite with this delivery or add as a separate entry. A default is suggested, and an existing row is overwritten only when the operator chooses it.
- Overwrite scope. Only the receipt columns are overwritten. QC results already recorded on the row are left as they are.
Lines written and lines skipped are reported in the result banner and recorded in the audit trail. The same checks apply in every department's logs.
Stock outlook
Enter the usual delivery time and the weeks of stock to hold, then select “Check the stock”. The outlook is advisory: it places no orders.
Three lists
The estimates are based on the receipts, Dates in Use and removals in the department's logs. Three lists follow, each with its count.
- Order: products estimated to run out before a delivery could arrive. Tick “ordered” (adding the material number is optional). The tick clears when the logs show the delivery. Each supplier's delivery time is then estimated from these recorded orders and receipts.
- Use these first: unopened lots expiring within 60 days, or within the department's expiring-soon period if that is longer. It also lists lots unlikely to be used up before they expire. Each has Put into use.
- Take off the shelf: expired unopened lots. Removals are written to the log's Number Discarded column after a preview. Lots that expired before the current month can be cleared from the list together with a reason. Clearing them does not write to the logs.
Also in the outlook
Past years' logs are used where they are loaded.
- Past years' logs are read only. They give a rate of use from the start, without waiting a year for Dates in Use to build up.
- Delivery calendar: the likely date of each supplier's next delivery, described below.
- Shelf counts. Counts are taken with a printable count sheet.
- Supplier record. Each supplier has a record for the yearly evaluation.
- Charts. Days-of-cover charts show how long stock will last.
- Expiry reminders. Reminders are saved as a calendar file. The file is imported into Outlook by the user. LotWarden does not connect to Outlook or Teams.
Delivery calendar
Open Delivery calendar under Stock. It uses the department's logs but does not alter them. A date is labelled as an estimate unless it was entered from a date the supplier gave.
- Estimates from the logs. The Date Received of past deliveries gives each supplier's usual interval. It is read from this year's and past years' logs. It also gives the weekday it usually falls on and the range to allow. At least four deliveries are needed.
- Orders. An order's own date takes precedence. Products can be ticked as ordered on the order list. An order can also be added to a supplier with the date ordered or the date expected, or both. With only the order date, the expected day is estimated from that supplier's past orders or from the page's delivery time.
- Late and due. An order past its expected day is shown as late. A supplier with no delivery in the logs for longer than its usual interval is shown as due.
- Month view. One calendar shows deliveries received and orders placed. It also shows expected days and estimates. Select a day to start an order on it.
- Order closure. The supplier's next delivery in the logs closes the order and records how long it took, which is used in later estimates.
- Calendar file: expected deliveries can be saved as a calendar file and imported into Outlook manually.
Record dates of first use
Date in Use records the day a lot was first put into use. It is a software record: it does not physically prevent a lot from being loaded on an analyser or taken from the shelf.
Recording a date
Find the lot by part of its product name or its lot number. Lots without a Date in Use are listed with their expiry.
- Set the date for each lot on the list separately. It can be today, yesterday or any past date. A future date is refused, and a date more than a week back raises a warning.
- Preview. The preview names the file, sheet and row for each lot. It warns when another lot of the product expires sooner or QC acceptance is not recorded.
- Writing. After a backup, entries are written to the working copy and signed and dated. IN USE is set to Yes.
Checks before writing
Each lot is checked against the register and the release record before it is written.
- Register checks. A Chemistry lot the register shows as not yet accepted raises a warning that requires a reason. So does a lot with a register condition not met. The reason is recorded in the audit trail with the signed-in person. A lot the register shows as REJECTED is refused.
- Release checks. A lot not yet released raises a warning in the pathology setting, and a reason is needed. It is refused there when the product is flagged critical and set to refuse. It is refused in the forensic, HSC collection and cell therapy settings.
- Refused and listed with the reason. A lot already dated is refused, as is a date before receipt. A lot expired by that date is refused too. So is a lot whose QC is recorded as not acceptable. So is a rejected or embargoed lot.
From the QC record
Where EQAWarden is linked, the day a lot first ran on an analyser can be read from EQAWarden's QC lot file or over the link. It is proposed as a Date in Use.
- Where the QC record shows the lot's first QC day within limits, the same line also records QC acceptable
- The level-by-level results are shown beside it
- Each line is written only when a person ticks and confirms it
- An existing date or value is never replaced. How the link works.
Barcode scanning
Scan in records Dates in Use from a barcode scanner. It is a preview function and still experimental.
Scanning
It works with a USB barcode scanner that types what it reads, as a keyboard would.
- Open Scan in and set the date
- Scan each box label as the lot goes into use
- Each scan is matched to its lot in the logs with its type (Reagent, Calibrator or Control)
- Each is added to a list, which is checked before the Dates in Use are written together
Checks and label formats
Until readings have been shown to be reliable at the site, compare each one with the label. Test a second label after teaching a layout.
- Flagged. A repeat scan is flagged, and so is a lot already in use. A lot not found in the logs is flagged too, as is an expiry that differs from the log.
- Formats: GS1 element strings are read directly. Other label layouts are taught from one scan, together with the lot and expiry printed on that label.
- Look up shows a lot's status without adding it; Scanner check shows exactly what the scanner sends.
Lot receipt, use and removal history
Search by lot number or part of a product name, and tick All departments to search across departments.
- Lot history reads the logs and the audit trail and changes nothing: the logs remain the record
- It supports a recall investigation by showing where a lot was received, used and removed
- These include records that ISO 15189:2022 clause 6.6.7 asks a laboratory to keep for each reagent and consumable
- Events. Each receipt shows the supplier and who received it. The lot's first use and removal are shown too. Each event gives its source: the log and row, or the audit trail.
- Current status. A lot is Unopened or In use, or Released. It can also be Expired on the shelf or Removed. Where the acceptance or materials record holds the lot, it can be Quarantined or Checked awaiting release. It can also be Check failed, Rejected or Embargoed. The status is shown with the expiry date and the register's verdict.
- Retained history: when a new year's laboratory log replaces the previous one, its lots remain searchable. The LotWarden log is continuous, so every receipt it has recorded stays in the history. Each keeps a link to the scanned delivery note.
The search covers the departments and logs loaded into LotWarden and the history retained from earlier logs. A lot recorded only outside those logs does not appear.
Review records and sign-off
Weekly queue and second check
The weekly queue lists expired and soon-to-expire lots, and lots in use without a Date in Use. It also lists delivery problems and lots awaiting PAT.
- Each item is marked Reviewed, then the week is signed off
- The weekly review prints on one page
- When the week is signed off, that page is kept as a PDF with the month's records
- Second check: a second person checks each delivery's logged lines against the delivery note. LotWarden refuses a second check by the person who received the delivery.
Month and year
The supervisor report gives the month in a workbook to print and sign, and as a page to read and print.
- Once the month is signed off, the report is kept in LotWarden's records with the sign-off on it. It sits beside the month-end PDFs
- Month-end PDF. At the end of each month, each of the department's logs is saved to PDF as the monthly backup. There is one file per log. Each file is recorded in the audit trail with its fingerprint and the audit trail's anchor, a fingerprint of the trail at that point. The page shows when a month has not yet been saved. The logs themselves are not changed.
- Log transfers: once a working copy has been copied into the controlled log, staff tick Copied into the controlled log. A working copy changed since its confirmation is shown again.
- Suppliers: each supplier's last 12 months for the yearly evaluation, with the outcome and any conditions.
CAPA register
The corrective and preventive action (CAPA) register records each nonconformity under ISO 15189:2022 clause 8.7.
- Each is opened from a lot held at receipt or by hand
- Each is worked through a seven-part tick sheet
- EQAWarden's items arrive over the link or by a checked file, with their signatures
- The assessment pack carries a CAPA register sheet
- CAPA signatures: accepting or dismissing a proposed item, confirming its cause and closing it are each signed electronically. A signed cause is locked: changing it needs a new signature. The earlier one is kept and shown as superseded.
- EQAWarden signs its own accept or dismiss, cause and effectiveness. Closure is LotWarden's
Named accounts
Each person signs in with their own named account. Nobody types initials.
- Each account has one of these roles: User, Authoriser, Administrator or Read only
- Sign-offs and releases are made by an Authoriser with an electronic signature. So are rejections and embargoes
- The password is entered again, and the signature shows as broken if the record is changed afterwards
- Every other action is recorded with the signed-in person
- Each sign-off is sealed and written to the audit trail
- The side menu shows the number of items waiting
The signature block
Wherever a signed record is shown or printed, its signature appears as one four-line block:
- Who signed, with their job title
- When, on the licensed PC
- What the signature means
- The signature's identity with its check
Assessment packs
Building a pack
Select the assessment the site's licence allows, then set the period and select Build the pack.
- A NATA assessment (ISO 15189 or ISO/IEC 17025)
- A TGA inspection (the Code of GMP)
- An ISO 9001 audit
- The pack is assembled from the selected records for the laboratory setting in force. That setting is printed in the pack's details and on the title slide
- Building a pack changes nothing in the logs
Two files
The pack is a presentation of the main charts and tables, and a workbook of the underlying records.
- Receipts and acceptance. The workbook holds receipts, lot acceptance and acceptance checks.
- Use and stock. It holds Dates in Use, removals and shelf counts.
- Suppliers. It holds suppliers and delivery problems.
- Control records. It holds the audit trail, change control and the CAPA register.
- Where they apply. It adds PAT scope, the acceptance record and external quality assessment (EQA) by lot.
The checklist
A checklist maps each item to its clause in the applicable standard.
- Five statuses. Each item is In order, Check or Partly covered. Otherwise it is Bring separately or For information.
- Rows to check are coloured, with the reason in the first column
- PAT scope: PAT is expected for every product the register lists. Any other product needs PAT unless it is ticked Exempt from PAT with a reason. The PAT scope sheet lists the exempt products. QC at first use recorded elsewhere is not flagged.
Before the visit
The pack organises the records LotWarden holds against the mapped requirements. It does not by itself demonstrate compliance.
- Before the visit, review the PAT scope sheet
- Prepare the items marked Bring separately, which the laboratory supplies from its own records
The pack, and every output, as a page
See the pack shows the same pack as one A4 document, in the look LotWarden and EQAWarden share. The workbook and the presentation stay as they are, offered as Download for Excel and Download the slides.
The pack as a page
A cover and contents. The cover names the laboratory and the laboratory setting, and the visit and the period. The contents list the sections in order.
- Question by question. Each item is given with its clause and its status. Its answer and the records behind it follow. The records include the lots received and the receipts to review. They also include Dates in Use, removals and suppliers. The review sign-offs and the CAPA register are there too.
- Signatures. Each electronic signature held in those records is shown in one four-line block. It is checked when the page is made. A closing page gives the checklist's status, with lines for the person who prepared the pack and the person who checks it.
Every other output
See it beside the workbook opens its page.
- Reviews and receiving. The supervisor review and signed report have pages. So do the received sheet, the lot check and the investigation worklist.
- Stock. The stock outlook and order list have pages. So does the expiry walk: a printed list to take round the shelves, with the expired lots to take off and the lots to use first.
- Shelf counts. The shelf count sheet has boxes to write the counts in. Its result has a page too.
- Suppliers and CAPA. The supplier record has a page. So do the CAPA register and each item.
A page says what its workbook says, and opening it writes nothing. Every page prints its page number and the line that LotWarden and EQAWarden are not affiliated with NATA or ISO.
OCR performance assessment
Reader accuracy measures how accurately LotWarden reads the laboratory's own delivery notes. The figures are meaningful only when they come from real delivery notes received at the site, so the assessment is run there.
- Pass marks. Before an assessment, set the pass marks for lot and expiry and for code and quantity. Also set the minimum number of lines required.
- Blind check. The program's reading of a delivery note is hidden while a person enters every line from the paper. The reading is then shown beside the entered lines, line by line.
- Report. It gives the field accuracy for lot and expiry and for code and quantity. Each has a 95% confidence interval (Wilson). Each figure is also given by supplier.
- Lines and lots. It counts complete lines read correctly and lines missed. It also counts lines read that were not on the paper. Misread lots are counted, with the number that would have matched a lot the register accepts (false acceptance matches).
- Everyday receipts. The correction rate on routine receipts, and the time from reading a delivery note to writing it.
- Printable. The report holds rates and counts only, with no lot number or other value from a delivery note.
- Lot · expiry · code · quantityaccuracy of each field against the pass mark set, with its 95% confidence intervalper field
- Complete lines correctevery field on the line as printed on the paperper line
- Lines missed · lines not on the paperomissions, and spurious lines readcounted
- False acceptance matchesa misread lot that matches a lot the register accepts, where the lot on the paper does notcounted
- By supplier · everyday corrections · time to writefrom routine receipts already completedrates only
The lines entered in a blind check are compared on the licensed PC and remain there.
Guided help
Ask LotWarden is available from every page.
Asking
Type a question in your own words, or choose a section and select one of its questions.
- Questions such as "how do I read a delivery note" or "where do I upload logs"
- Each answer is short
- Show me steps through the task on the page in use, with the laboratory's own data
Step-by-step highlighting
A numbered box and a ring mark the control to use, and the box advances once that control has been used.
- Ask LotWarden enters nothing, adds no file and writes nothing
- Each step is carried out by the person
- Steps that follow the page. Where a delivery note's supplier has no saved layout, it offers the supplier layout steps and returns to the delivery afterwards.
Predefined answers, no AI
Every answer and step was written in advance by LotWarden's developer and is matched to the words typed.
- No AI here means no generative AI and no language model
- There is no AI service, and nothing learns from the laboratory's data
- Nothing typed leaves the licensed PC or is kept
What it covers
Its sections include:
- Help with receiving. It covers reading a delivery note and setting up a supplier layout. It also covers loading the department's logs and the acceptance register.
- Help with stock. It covers Dates in Use, ordering and removals.
- Help with records. It covers a lot's history, the month-end PDF and the assessment pack.
Data storage
LotWarden keeps its working records separate from the files it produces for people to read.
Sealed (encrypted)
Log working copies, the register and the Master Stock workbook are sealed. So are backups and lot history.
- Also sealed. Review sign-offs and stores records are kept the same way. So are Reader accuracy entries and taught barcode layouts.
- While working. The program opens what it needs and seals it again after each write.
- Drive encryption. LotWarden's encryption (AES-256-GCM) is in addition to the laboratory's own drive encryption, such as BitLocker. It does not replace it. Key handling is described in the IT documentation.
Readable files
The audit logs and licence files stay readable. The audit trail and the authorisation can then be checked independently.
- Files for staff. Scanned delivery notes, received sheets and worklists stay readable. So do outlooks and packs, and exports and reminder files. These are protected by the laboratory's own file permissions.
- Opening a log: select Export a readable copy on the review screen. Move the entries into the controlled log and record the transfer under Reviews. Then delete the readable copy.
Security evidence
Security evidence is under Records. One action tests each control on the copy in use, including the encryption.
- It prints the results for IT. What it tests.
- Chemistry reagent log 2026, working copya log it storessealed
- Stock Report of 26/09/2026the acceptance registersealed
- Chemistry reagent log 2025a past year's logsealed
- Audit logscheckable without the programreadable
- LotCheck workbook for the deliverya file produced for staffreadable
What was sealed and what was readable after the delivery pictured on this page, on fictional demonstration data.
Recommended operating practices
Select the department, then load its files
Select the department receiving the goods. Then load that department's files before the delivery note PDF, so that checks use the current copies.
Keep delivery notes unmarked
Place ticks beside figures rather than over them. Ink over a digit can make it unreadable, both to OCR and to a person.
Confirm quantities
The extracted table is a draft for checking. A blank quantity means the boxes need to be counted.
Check the Log column
Each line shows its destination log and sheet before anything is written. “? check” means the product is not recognised: assign its log in Chemistry, or pick the product from the department's own log.
Keep Dates in Use current
Record lots put into use each week, from Date in Use or Scan in. Stock estimates and assessment packs use these dates.
Transfer working copies promptly
Working copies are not the controlled record. Transfer updated entries into the controlled logs and record each transfer under Log transfers. Dropping in a new copy of a log archives the copies it replaces in a dated folder. Nothing is deleted.
Lot records alongside EQA review
LotWarden is one of the two applications of The Warden Platform. It can be used on its own.
- LotWarden records the receipt and acceptance status of laboratory materials
- It records their release where used, and their first use and removal
- EQAWarden supports review of EQA results and records the reviewer's outcome
- When the two are linked, EQA results can be reviewed alongside the lot-use records
- The basis and confidence of each association are shown
- The link stays off until a user switches it on
Demonstration and evaluation
Choose a 20-minute screen-share on fictional demonstration data. Or run an evaluation on a licensed PC at the laboratory, for a term agreed with your laboratory.

















